檢測(cè)認(rèn)證人脈交流通訊錄
這真不是您需要的服務(wù)?
Test item 測(cè)試名稱(chēng): Office panel systems – Workstations 屏風(fēng)測(cè)試
Test info 測(cè)試內(nèi)容
| Clause | Test Requirement | |
| 2.1 | Safety 安全 | |
| 2.2 | Cable management 線(xiàn)管理 | |
| 2.3 | Storage facilities 存儲(chǔ) | |
| 2.4 | Dimensional requirements - seated workstations 尺寸要求 | |
| 2.5 | Counter workstations 柜臺(tái) | |
| 3.2.1 | Mechanical strength test for panel system products 機(jī)械強(qiáng)度要求 | |
| 3.2.2 | Static load test for storage shelves 架子承重要求 | |
| 3.2.3 | Cabinet test 柜子測(cè)試 | |
| 3.2.4 | Static load test for work surfaces without supported drawers 不太抽屜的桌面靜載測(cè)試 | |
| 3.2.5 | Static load test for work surfaces with supported drawers 帶抽屜的桌面靜載測(cè)試 | |
| 3.2.6 | Lock test for drawers supported by work surfaces 鎖測(cè)試 | |
| 3.2.7 | Outstop test for drawers supported by work surfaces 沖擊外擋塊測(cè)試 | |
| 3.2.8 | Rebound test for drawers supported by work surfaces 反彈測(cè)試 | |
| 3.2.9 | Dislodgment test for panel-mounted components 分離測(cè)試 | |
| 3.2.10 | Horizontal and vertical adjustment tests 水平及垂直調(diào)節(jié)測(cè)試 | |
| 4 | Stability requirement 穩(wěn)定性測(cè)試 | |
| 7 | Marking 標(biāo)簽要求 | |
| Sample required: 4 sets of completed products with assembly instruction (if applicable) is recommended. | ||
| 樣品要求:4套并含安裝說(shuō)明書(shū) | ||
| Turnaround time: 10 working days | ||
| 測(cè)試周期:10個(gè)工作日 | ||
Photo for reference 參考圖片: